China's Westward One Belt One Road Strategy


Hendrik_2000

Brigadier
Milestone reached in Nyingzhi -Lhasa railaway. From security point of view it will secure the Tibet -India border and soon open 2nd line of transport to Tibet from Chengdu


The construction of all 47 tunnels on a railway linking Lhasa and Nyingchi in southwest China's Tibet Autonomous Region is completed after the last two vital tunnels ended on Tuesday thanks to five-year painstaking efforts. The last two tunnels are Mainling and Zagar.


Construction on the last two of the 47 tunnels on a 435-km railway linking Lhasa and Nyingchi in SW China's
Please, Log in or Register to view URLs content!
Autonomous Region was completed Tue, marking huge progress for the mammoth project. The railway is expected to be put into operation in 2021.

Please, Log in or Register to view URLs content!


1586272591041.png
 

Hendrik_2000

Brigadier
Please, Log in or Register to view URLs content!



Workers lay tracks at the construction site of the China-Laos railway in Vientiane, Laos, March 27, 2020. With its first 500-meter-long rail steadily laid on the subgrade, the China-Laos railway kicked off its track laying work on Friday in Lao capital Vientiane. The rail is the longest one outside China in Asia and it was also the first time the CYP500 track laying machine has been used in railway construction in Southeast Asia, said Hu Bin, project manager of the China Railway No. 2 Engineering Group (CREC-2). (Photo by Kaikeo Saiyasane/Xinhua)

VIENTIANE, March 27 (Xinhua) -- With its first 500-meter-long rail steadily laid on the subgrade, the China-Laos railway kicked off its track laying work on Friday in Lao capital Vientiane.

The rail is the longest one outside China in Asia and it was also the first time the CYP500 track laying machine has been used in railway construction in Southeast Asia, said Hu Bin, project manager of the China Railway No. 2 Engineering Group (CREC-2).

The machine has advantages of high reliability, strong compatibility, standardized operating procedures, and high laying accuracy, he told Xinhua.

The CYP500 can lay about 2 km-tracks per day, exceeding the required average daily laying progress of 1.5 km.

The Laos-China Railway Co., Ltd. (LCRC), a joint venture based in Vientiane in charge of the construction and future operation of the railway, told Xinhua on Friday that the first track laying of the China-Laos railway indicates that the railway construction has entered a critical period of track engineering.

Since the commencement of construction in December 2016, Chinese and Lao engineering companies have overcome complex geological and geographical environments and resource shortages, adhered to quality work, dynamically optimized construction organization, scientifically allocated construction resources, and carried out environmental protection in design and construction, according to the LCRC.

The project construction has been advancing in an orderly and steady manner amid the COVID-19 pandemic, said a LCRC press release, adding that the project progress can meet the scheduled completion date in 2021.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The 414-km railway, with 198-km tunnels and 62-km bridges, will run from Boten border gate in northern Laos bordering China, to Vientiane with an operating speed of 160 km per hour.

The electrified passenger and cargo railway is built with the full application of Chinese management and technical standards.

The project started in December 2016 and is scheduled to be completed and open to traffic in December 2021.
[IMG]

1586273631269.png
 

Hendrik_2000

Brigadier
What you guys think This line will improve the security of Southern Chinese border considerably. It is mammoth jobs lasted decades.The section from Lhasa to Nyingzhi should be finished 2021. Chengdu -Yaan should be finished about the same time . The Complete line won't be finished until 2025 .
"Kangding-Nyingchi segment of Sichuan-Tibet Railway would start construction in 2018 and it's expected to be accomplished by the year of 2025, five years ahead of schedule", said Lin Shijin, the deputy chief engineer of China Railway Corp.
Another line is planned from Korla in Xinjiang but still in planning phase.

Via Song Hong

This line comes very close to the PLA frontier and mountain pass such as Cona (opposite Indian occupied Tawang), Medog and Zayu.

The eventual plan was to open a supply line from Chengdu, far more efficient than from Qinghai-Tibetan railway.

The reason PLA retreated from South Tibet in 1962 is logistic. Logistic will improve tremendously with this line.

Today if PLA take Tawang-> Bomdila, she can hold it.

Meanwhile from Shigatze, another rail was planned to reached Geelong, the frontier town of Nepal. It will break India choke on Nepal.

1586532271274.png

Kangding-Nyingchi Segment of Sichuan-Tibet Railway
As a major corridor to Tibet, Sichuan-Tibet Railway starts from Chengdu and ends at Lhasa, via Ya'an, Kangding, Gangtuo, Chamdo, Nyingchi and Lhokha. The operating length of Chengdu Lhasa railway is about 1,838 kilometers and its main truck is around 1,738 kilometers. Covering 1,413 kilometers of bridges and tunnels, the engineering investment is estimated to be over 216.6 billion yuan. Chengdu Tibet railway has a designed speed of 200 km per hour, and some segments are limited to 160 km per hour. Once completed, it would take passengers only 13 hours to
Please, Log in or Register to view URLs content!
by train. However, up to now, it still costs tourists almost three days to drive from Chengdu to Lhasa.

Construction work of Chengdu-Ya'an railway has started by the end of 2014; Lhasa-Nyingchi railway has also begun building since June 2015. The feasibility study of Ya'an-Kangding (Xinduqiao) railway has been finished in January 2016. And the pre-feasibility study of Kangding-Nyingchi railway will be completed this month, so far, we'll have a chance to see the integrated Sichuan Tibet Railway Line.
 

Hendrik_2000

Brigadier
The other side of southern Tibet railway, is extension of Lhasa Shigatze line to Katmandu work in progress Shigatze-Gyirong is in construction phase right now.But Nepal and China has sign the contract to built extension to Katmandu
Please, Log in or Register to view URLs content!

Lhasa Kathmandu Train Route
The route of the train to Kathmandu is believed to be following the general route of the G318 Friendship Highway for most of its length. The
Please, Log in or Register to view URLs content!
has already been completed, and trains are already running along this section of the route, terminating at the moment in Shigatse City, to the west of Lhasa.

The remainder of the route, which has yet to be completed, has been proposed to cross the rest of the plateau following the rough path of the Friendship Highway. The proposed crossing point of the railway line is at
Please, Log in or Register to view URLs content!
, which is the current crossing point for overland tourists into and out of Tibet. The route will then descend from the mountains and run to Kathmandu, the Nepali capital.

Lhasa Kathmandu Train Map

Lhasa to Kathmandu Railway Route Map
 

Hendrik_2000

Brigadier
In planning phase is line to Bhutan from Shigatze to Yadong

Lhasa Yadong Train Route
The first part of the Lhasa to Yadong line is going to follow the Lhasa-Shigatse railway, which will then branch off and head southwards towards the Indian state of Sikkim. A small county that juts southwards in-between India and Bhutan, Yadong County is a strategic point for crossing the border into India, and a railway service would be a blessing to both tourists and trade partners alike.

However, the railway is still in the planning stages, and construction has not yet started, although it has been reported that the line is expected to be completed by 2020. AS the section from Lhasa to Shigatse is already complete, the remaining section should not be as hard to construct, especially now that the track builders have had plenty of experience in building railway lines in the high-altitude plateau environment.

Lhasa Yadong Train Map
 
What you guys think This line will improve the security of Southern Chinese border considerably. It is mammoth jobs lasted decades.The section from Lhasa to Nyingzhi should be finished 2021. Chengdu -Yaan should be finished about the same time . The Complete line won't be finished until 2025 .
"Kangding-Nyingchi segment of Sichuan-Tibet Railway would start construction in 2018 and it's expected to be accomplished by the year of 2025, five years ahead of schedule", said Lin Shijin, the deputy chief engineer of China Railway Corp.
Another line is planned from Korla in Xinjiang but still in planning phase.

Via Song Hong

This line comes very close to the PLA frontier and mountain pass such as Cona (opposite Indian occupied Tawang), Medog and Zayu.

The eventual plan was to open a supply line from Chengdu, far more efficient than from Qinghai-Tibetan railway.

The reason PLA retreated from South Tibet in 1962 is logistic. Logistic will improve tremendously with this line.

Today if PLA take Tawang-> Bomdila, she can hold it.

Meanwhile from Shigatze, another rail was planned to reached Geelong, the frontier town of Nepal. It will break India choke on Nepal.

View attachment 59048

Kangding-Nyingchi Segment of Sichuan-Tibet Railway
As a major corridor to Tibet, Sichuan-Tibet Railway starts from Chengdu and ends at Lhasa, via Ya'an, Kangding, Gangtuo, Chamdo, Nyingchi and Lhokha. The operating length of Chengdu Lhasa railway is about 1,838 kilometers and its main truck is around 1,738 kilometers. Covering 1,413 kilometers of bridges and tunnels, the engineering investment is estimated to be over 216.6 billion yuan. Chengdu Tibet railway has a designed speed of 200 km per hour, and some segments are limited to 160 km per hour. Once completed, it would take passengers only 13 hours to
Please, Log in or Register to view URLs content!
by train. However, up to now, it still costs tourists almost three days to drive from Chengdu to Lhasa.

Construction work of Chengdu-Ya'an railway has started by the end of 2014; Lhasa-Nyingchi railway has also begun building since June 2015. The feasibility study of Ya'an-Kangding (Xinduqiao) railway has been finished in January 2016. And the pre-feasibility study of Kangding-Nyingchi railway will be completed this month, so far, we'll have a chance to see the integrated Sichuan Tibet Railway Line.

Great!, but I am not sure whether security of the Indian border is the main reason for the construction. I think it is for the more opening of Tibet, the security is just a bonus. China has had already massive airlift fleets Y-9. Y-20 IL-76, etc. So there is no issues at all to secure the border
 

Hendrik_2000

Brigadier
Great!, but I am not sure whether security of the Indian border is the main reason for the construction. I think it is for the more opening of Tibet, the security is just a bonus. China has had already massive airlift fleets Y-9. Y-20 IL-76, etc. So there is no issues at all to secure the border

Well Indian has better geographical advantage than China since their territory is on lower elevation and more vegetation and closer to Urban center meaning it can be reinforced easily.Plus most of Indian air and army bases are located closer to the border, So their logistic line is shorter.

Tibet is harsh region and cannot support a large army because it will deprive the civilian of the same good
So most of the large Chinese bases are located in Qinghai and Xinjiang a long logistic line and cabe easily disrupted. That is why this new line will add security The distinction between civilian and military is blurred in Tibet During the 50's Chinese army has the foresight of building road from Xinjiang to Tibet , Qinghai to Tibet and that proof tobe god send in 62 war

Like they say some people talk of flashy weapon, tactic but professional talk about logistic
 