Indian Military News, Reports, Data, etc.

HaldilalSDF

Junior Member
Registered Member
The Ghatak's design, it will most likely have a 1D fluidic TVC about the yaw axis. That is required due to lack of rudder in Ghatak. The Pitch and Roll axes control will be done using traditional control surfaces.
 

HaldilalSDF

Junior Member
Registered Member
HAL MD say that MK1A will not fly with GE engines but with Indian ones and that GE has been not part of this contract. The Setting of the Indeginious Engine Manufacturing plant has been approved. And will not have to depend on the GE Engines. The already ordered engines from the GE will be used.

To ensure the timely delivery of Tejas MK1A. A penalty clause has been added into the contract. - In an event of on time delivery failure, 10% penalty can be imposed on HAL. - Also inflation of that year will not be counted. HAL CMD Mr. R Madhavan.
 

HaldilalSDF

Junior Member
Registered Member
I Guess, DRDO have made significant progress with kaveri. If The HAL CMD is saying that DRDO is setting up a fighter engine complex. That means only one this or what ever it's good news.

GE engines are coming assembled and they just need to be integrated.
 
Top