The translation was just ChatGPT with minor edits, haha.
It’s probably because the blueprint happened to exist, and the use of it as a "size floor". They made a similar estimate for a future CV, for which the CV-67 would be a suitable basis. The conclusion here is much simpler: to have a more efficient CV, its size needs to be bigger. (pictured below is plan for a 326m carrier, probably in the 90k tons class)
![]()
I just found it odd that they chose to use CV-67 as a base to start off with, I wondered if there was some meaning to it.
I suppose if it's because they happened to find a CV-67 schematic then it makes sense.
Incidentally, on the matter of how a future CV may look like in terms of deck configuration, assuming something that is 90k tons (a bit smaller than a CVN), I actually think having the two starboard elevators positioned so there is one in front of the island and one behind the island would make a bit more sense.
The idea being that you don't want the forward elevator to be directly adjacent to a catapult launch position, assuming a three elevator setup with two starboard and one port (adapting their image, something like below)
It would also mean the island and smokestack would naturally be in a more central hull position closer to the main powerplant.
