Adding one more, close up. Posted by
Please, Log in or Register to view URLs content!
on Twitter.
Fq8B-7paMAA1cMl.jpeg

View of the remaining 3 052DLs under construction in the drydock of Dalian after the other 2 052DLs were launched this morning. Posted by @WayneSong on Weibo.
84140c7fly1hbw175f0adj215o0rsamm.jpg
Looks like the 2 just-launched 052DLs are moored at the bottom right corner.
84140c7fly1hbw17616avj215o0rsk56.jpg

Meanwhile, here's a look at Jiangnan from a plane landing at Shanghai Pudong. Posted by @利刃斩海飞剪艏 on Weibo.
007Zyiyfly1hbw0od30hcj31jk15o48y.jpg
Notice the hull segments of what looks to belong to a 052DL(?), according to the arrows.
006i7G9Vly1hbw1mezc4yj30y90gbdnd.jpg
 
Last edited:

by78

General
High-resolution versions. Pardon the large dimensions, but the file sizes are quite small.

52741209505_bd4e65f3fd_3k.jpg
52740282187_b6a14e92da_3k.jpg
52741288203_86e229b57d_3k.jpg
52741288013_71869dfe9e_3k.jpg
52741209600_dc606fa835_3k.jpg
 

zbb

Junior Member
Registered Member
Another view of the 052DL drydock in Dalian. Posted by
Please, Log in or Register to view URLs content!
on Twitter.

View attachment 108817

Any idea why the rear 3 052DLs' construction progress seems rather slow?

What would they do with the outer dry dock now that the outer two ships have launched?

Will they just let it sit unused until the 3 ships in the inner dry dock are launched? If so, they would just be wasting dry dock space. It's generally easier to do work in dry dock than after a ship is launched, so they would have been better off just keeping the 2 052DLs that just launched in dry dock longer.

Thus, it would only make sense if they are going to use the outer dry dock to build additional ships. It would then also make sense that the inner 3 ships are progressing much slower as they will only be launched when the new set of ships in the outer dry dock are launched.

So my guess is that we are looking at a batch of 8 ships in total being constructed at Dalian and there will be another 3 new 052DLs starting construction in the outer dry dock soon. Perhaps we will get to see six 052DLs launching at the same time!
 
Last edited:

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
What would they do with the outer dry dock now that the outer two ships have launched?

Will they just let it sit unused until the 3 ships in the inner dry dock are launched? If so, they would just be wasting dry dock space. It's generally easier to do work in dry dock than after a ship is launched, so they would have been better off just keeping the 2 052DLs that just launched in dry dock longer.

Thus, it would only make sense if they are going to use the outer dry dock to build additional ships. It would then also make sense that the inner 3 ships are progressing much slower as they will only be launched when the new set of ships in the outer dry dock are launched.

So my guess is that we are looking at a batch of 8 ships in total being constructed at Dalian and there will be another 3 new 052DLs starting construction in the outer dry dock soon. Perhaps we will get to see six 052DLs launching at the same time!

Check what they did before in the mid/late 2010s for DL there.

After the launch of the outer hulls, they would then remove the barrier, move the inner half drydock hulls to the outer half of the drydock, and start construction of new hulls in the newly vacated inner half.
 

zbb

Junior Member
Registered Member
Check what they did before in the mid/late 2010s for DL there.

After the launch of the outer hulls, they would then remove the barrier, move the inner half drydock hulls to the outer half of the drydock, and start construction of new hulls in the newly vacated inner half.
Thanks, I wasn't aware of that possibility. Are the inner hulls placed over wheeled platforms or can they still be moved with the crane?
 