Turkey Military News, Reports, Data, etc.

sequ

Colonel
Registered Member
This is basically official confirmation that the Kaan engine is named TF35000


Gp4pKT6WYAAxuMR
 

sequ

Colonel
Registered Member
Because of the need, they are trying to fly the TF10000 before the TF6000. TF6000 has undergone almost 100 tests by now. Thrust levels achieved so far are higher than the AI-25TLT (~3800lbf). Aimed thrust is 6000lbf dry and more than 10000lbf wet.

Please, Log in or Register to view URLs content!
 
Last edited:

sequ

Colonel
Registered Member
There are new developments (TS3000/TF35000) in the field of aeroengines but they aren't allowed to speak about it by orders of SSB. They are hinting that at IDEF in July there'll be some announcements made. The time to prototype production of the TF35000 is "short".


 

CasualObserver

Junior Member
Registered Member
Because of the need, they are trying to fly the TF10000 before the TF6000. TF6000 has undergone almost 100 tests by now. Thrust levels achieved so far are higher than the AI-25TLT (~3800lbf). Aimed thrust is 6000lbf dry and more than 10000lbf wet.

Please, Log in or Register to view URLs content!
Acc. to Ibrahim Sünnetçi (who's our most credible insider/newsperson) Anka-3 uses AI-322, thus >5,511.6 lbf.
 
Last edited:

sequ

Colonel
Registered Member
Hypothetical size difference between KE-B and KE-C by enlargement of 40%


Length: 20.58m
Span width: 14m
Wing Area: 76m2
Empty Weight: ~8500kg
Wingload at empty weight: 112kg/m2
Endurance: 2.5 times that of similar sized twin engine heavyweight 5th generation supercruise capable fighters. (4x less thrust+20% better fuel consumption but with half the internal fuel load).


View attachment 136207
No need to photoshop to two engines. It'll have a single engine.

Depending on the BPR of the engine, it could have at least 1.75 times the endurance of the Kaan. (Just 29% of the fuel consumption, but ~50% fuel capacity)
 
Last edited:

sequ

Colonel
Registered Member
Oh damn, Baykar aims to develop a 20000 lbf turbofan engine for the Kizilelma! I bet that'll be for the original twin engine variant.
I wonder whether they bought the AI-9500F design or are going for a clean sheet design? Last year they claimed it to be ready to produce in 4 years.

1746534040075.png1746534091068.png1746534027546.png
 
Top