PLAN Fleet supply vessels

Blitzo

General
Staff member
Super Moderator
Registered Member
Looking at the engine room from the satellite image, it's still 4x diesels and the arrangement is similar to original 901? Hope there are some better engines otherwise it will be hard for this 901 ProMax to follow CSGs.

Based on the satellite image it's hard to determine its prime movers at this stage.

GTs or diesels can both remain in contention.
 

00CuriousObserver

Senior Member
Registered Member
Comments from @type36512. He thinks it'll be launched around summer.

Just to be safe, I bought satellite imagery and checked. The ship under construction is definitely a new replenishment ship. Construction is taking place in Dock No. 2, and at the moment there is only one hull. Its actual dimensions really are around 260 to 270 meters in overall length. In the Janes image it is cut off, but a bit farther south there are already blocks for the superstructure, including the funnel, in place. At this pace of construction, it will probably be launched around summer.

 

no_name

Colonel
First type 076 then this. It's like the Chinese military has foresaw what is happening now with the US navy, her military bases and Iran and realising that in the age of long range missile/drone proliferation oversea bases have reduced value in combat situations and instead held the stationed troops hostage. Their navy expedition group is now going for more mobility, independence and endurance.
 
Top