I'm pretty sure unlike to what Wikipedia claim, 901 used diesel engines.The original Type-091 uses 4 gas turbines?
But presumably they will use more powerful gas turbines as the ship is significantly larger (~70K tonnes?)
I'm pretty sure unlike to what Wikipedia claim, 901 used diesel engines.The original Type-091 uses 4 gas turbines?
But presumably they will use more powerful gas turbines as the ship is significantly larger (~70K tonnes?)
Looking at the engine room from the satellite image, it's still 4x diesels and the arrangement is similar to original 901? Hope there are some better engines otherwise it will be hard for this 901 ProMax to follow CSGs.
Just to be safe, I bought satellite imagery and checked. The ship under construction is definitely a new replenishment ship. Construction is taking place in Dock No. 2, and at the moment there is only one hull. Its actual dimensions really are around 260 to 270 meters in overall length. In the Janes image it is cut off, but a bit farther south there are already blocks for the superstructure, including the funnel, in place. At this pace of construction, it will probably be launched around summer.
Mock-up. The ships is on sea trial.Z-20 mock-up or real thing?