Machinery Engineering Corporation is working on
Please, Log in or Register to view URLs content!
block II coal mine & power plant. 60% of target has been completed. Open pit mine is dug down to 120m, much ahead of time. Boiler has steam drums in position, Main Hall & Cooling Tower are almost finished.

27750418_2004950923106765_3783067610003191849_n.jpg


27752580_2004950943106763_1866964529585879762_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


Electrical & Mechanical Equipment Installed at
Please, Log in or Register to view URLs content!
Hydro Power Project by German Firm Voith Hydro E&M Contractor.

1410 MW Tarbela 4th Extension HydroPower Project Under construction Tarbela 4th will be commissioned by this month with its first unit going into operation.
while the second unit of the project will come on line by end April 2018 and the third unit by end May 2018.

Under Tarbela 4th Extension Hydro power Project, 3 electric power generating units - each of them having capacity of 470 MW-are being installed at tunnel 4 of Tarbela Dam.

With completion of the project, generation capacity of the existing Tarbela Hydel Power Station will increase to 4888 MW from the existing 3478MW. Tarbela 4th Extension Hydro power Project will provide 3840 Giga Watt H(3.84 billion units of electricity)to the National Grid annually..

27972896_2004697223132135_6346670907089470483_n.jpg


27752592_2004696993132158_7794496693234361902_n.jpg


27867961_2004697073132150_394865688286558669_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


Please, Log in or Register to view URLs content!
-
Please, Log in or Register to view URLs content!
scientists detected evidence that might prove the existence of combustible ice in the
Please, Log in or Register to view URLs content!
Trench with potential for a major discovery worth billions of dollars of energy resources within
Please, Log in or Register to view URLs content!
’s territorial waters.

 

timepass

Brigadier
Please, Log in or Register to view URLs content!


Please, Log in or Register to view URLs content!
update Pic 1: Pavement construction of KKH Phase-II (
Please, Log in or Register to view URLs content!
-
Please, Log in or Register to view URLs content!
). It is 118km long, 39km is expressway at 80 - 100kph, 79km is class-II highway at 60kph. Pic 2: Abbottabad Interchange. Pic 3: Abbottabad Tunnels. Pic 4: Pre-casting Yard that shall make 4292 Girders.
Please, Log in or Register to view URLs content!
-
Please, Log in or Register to view URLs content!
...

27858358_2005066653095192_4982052944492895609_n.jpg


27750594_2005066599761864_4348501628693552666_n.jpg


27972241_2005066579761866_2535318941716639955_n.jpg


27751611_2005066563095201_1296060931020548439_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


A high-level
Please, Log in or Register to view URLs content!
delegation will visit
Please, Log in or Register to view URLs content!
in March to review progress on
Please, Log in or Register to view URLs content!
projects. They will interact with high-level officials & local trade bodies and will visit all provinces to ensure speeding up work on all 9 Special Economic Zones.

27857928_2005081249760399_8410706733636383038_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


Please, Log in or Register to view URLs content!
- Pic 1: 22000 hard-working Pakistani staff are hired alone on
Please, Log in or Register to view URLs content!
-
Please, Log in or Register to view URLs content!
Please, Log in or Register to view URLs content!
(
Please, Log in or Register to view URLs content!
-
Please, Log in or Register to view URLs content!
Section). Pic 2: Sub base & road base along 392 km motorway are completed. Pic 3: Sutlej River Bridge (647m) in progress. Pic 4: Asphalt base course has started.
Please, Log in or Register to view URLs content!
...

27750661_2005195626415628_7078618336829485140_n.jpg


27750772_2005195666415624_8723126608930097348_n.jpg


27972405_2005195593082298_1499684212018921536_n.jpg


27867931_2005195649748959_6170890948771136943_n.jpg
 

timepass

Brigadier
Please, Log in or Register to view URLs content!


97.5 % work on 969 MW Neelum Jhelum hydro power project completed.100 per cent concrete work of the project had already been completed, besides 98 per cent dry test of the equipment.

It has four generating units, each of them having a capacity of 242.25 MW. The first unit will start electricity generation in March this year, Annual benefits of the project have been estimated at Rs 50 billion.