@BoraTas and I recorded an episode on Type 09V just this afternoon and you can find it here.
We did raise one point that I think is worth watching out for, which is when will Type 09VI come out and what it will look like. 09VI will be the first non-Western SSBN that can get through USN containment and get close to intended target to fire off ballistic missile vs firing from 10000 km away. As such, it will be a really big deal whenever it gets produced. And we will see if it's a clean sheet like Columbia class with 13m+ beam.
Other thing that Bora raised is that the length to beam ratio of Type 09V as we see it now is quite ideal in terms of hydrodynamics (between 8 and 9 to 1) whereas the block 5 Virginia class is like 14:1 iirc, which is not ideal at all.
A couple of thoughts:
If the PLA's nuclear doctrine remains that of maintaining a credible, minimal deterrence, would its SSBNs need to get closer than 10k km, especially with ever improving SLBMs?
Granted having a highly stealthy SSBN means that has more options to hide in larger areas of the world's oceans, & that might mean closer to the target by default.
I'd like to add some on the 096 SSBN.
We do know that the JL-3 SL-ICBM on the 094/A SSBNs is already capable of reaching CONUS from within the 1IC. With this in mind, I suppose it is reasonable to expect that the JL-4 SL-ICBM on the 096 SSBNs would largely maintain the overall range from the JL-3 while increasing its payload capacity.
On the other hand, even if the JL-4 has a reduced range of ~10000 kilometers, I would deduce that the reduction could come from pushing the carried payload on the SL-ICBM to its maximum limit. In addition to what you guys have mentioned, using the most advanced silencing technologies that China has today would enable the 096 SSBNs to venture deeper across the world's oceans and to locations where they had never been before.
Let's just say that it'd be a pretty nasty surprise once the 096 SSBNs are discovered patrolling in the Atlantic or somewhere in the Eastern Pacific.
Moreover, we could also consider the potential avenues of having the SL-ICBMs tipped with HGVs instead of the conventional conical RVs that we have today. HGVs (especially the waverider design) would require greater volume (and therefore, mass) for the same amount of nuclear payload as conventional conical RVs, so having greater potential payload capacity could also mean having the same number of warheads that can be carried per SL-ICBM for both JL-3 and JL-4, but with more of the warheads of the JL-4 having better chances at evading and penetrating the enemy's integrated ABM/AHM systems to reach their targets than the warheads of the JL-3.
Another exciting thought is that if the 09VI ends up comparable in size to the Columbia, I wonder whether the PLAN could produce a SSGN variant that carries the CJ-1000 cruise missile? That would be a pretty potent combo, if feasible.
I'd go one step further and say that if the rumored 1100-1200mm LVLS cells for the next-gen DDGs/CGs are actually true, then they can definitely employ the sub-launch variants on the 096 in the SSGN configuration. This could theoretically be done by utilizing the purported 2.4-2.6 meter-diameter individual SL-ICBM tube spaces meant for the JL-4 to carry dual-pack VLS tubes for the larger strike missiles.
Such settings shouldn't be limited to the (navalized variant of) CJ-1000 - Something like a navalized DF-17 or DF-16B is also possible.
Sometime ago, I did some rough extrapolation in the PLAN Next-gen Surface Combatant thread - The rumored LVLS cells could actually reach a depth of 12-13 meters. This would be sufficient for something the size of the 096 SSBNs, supposing that the sub has a diameter of ~14-15 meters plus the additional ~1-2 meters of turtleback to better (and is originally meant to) fit the JL-4.
And similar to the 096s in SSBN configuration - The impact of having 096s in SSGN configuration constantly patrolling off Hawaii and the western seaboard of CONUS is certainly something to say at least. Plus, honestly, this sounds like a much better idea should the PLAN decide to procure "true SSGNs" in the future, rather than actually lengthen the 095 SSNs into "Block 5+ Virginia" levels of absurdity.
Of course, this part is purely theoretical at present.