J-15 carrier-borne fighter thread

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
The J-15 story is getting more and more confusing!
1f62e.png
1f914.png
... and now here is J-15 no. 72!
While the renumbering from 1xx numbers to 01-24 made sense and the additional Batch 03 fighters logically became No. 30+, the No. 60 modex J-15 were or are still unusual.
My feeling tells me that we see a second squadron under construction with numbers 01-35 in the first wing and no. 60-xx in the second.

(Image courtesy of KTLJ via Huitong's CMA-Blog)

J-15 no. 72.jpg
 

11226p

Junior Member
Registered Member
The J-15 story is getting more and more confusing!
1f62e.png
1f914.png
... and now here is J-15 no. 72!
While the renumbering from 1xx numbers to 01-24 made sense and the additional Batch 03 fighters logically became No. 30+, the No. 60 modex J-15 were or are still unusual.
My feeling tells me that we see a second squadron under construction with numbers 01-35 in the first wing and no. 60-xx in the second.

(Image courtesy of KTLJ via Huitong's CMA-Blog)

View attachment 70943
Beat my by half a minute damn. I agree this just throws up more questions. I would like to know if the 6X is filled already given that we have a 7X serial. Also what is the state of the 3X serials, I assume they wouldn't just build half a dozen aircraft with lower serials of new batch and then renumber to a higher first digit so there is bound to be a serial higher than 35 (and what about 4X then, just not spotted?).
It could also be that we are just understimating numbers by quite a bit even if not all numbers from 00-72 are filled. Given that we already see large spread of spotted serial numbers I'd assume we are at ~50 J-15 now.
Anyway production rate seems to be relatively decent right now.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
Beat my by half a minute damn. I agree this just throws up more questions. I would like to know if the 6X is filled already given that we have a 7X serial. Also what is the state of the 3X serials, I assume they wouldn't just build half a dozen aircraft with lower serials of new batch and then renumber to a higher first digit so there is bound to be a serial higher than 35 (and what about 4X then, just not spotted?).
It could also be that we are just understimating numbers by quite a bit even if not all numbers from 00-72 are filled. Given that we already see large spread of spotted serial numbers I'd assume we are at ~50 J-15 now.
Anyway production rate seems to be relatively decent right now.


Wow ... I was quicker than you? I should mark the calendar! ;)
Well, as you noted, more questions than answers, but my feeling tells me that there are indeed two squadrons - maybe even brigades with about 35 aircraft in formation. 1st one with J-15s nos. 01 to 35 and the 2nd one - skipping thee number 40s and 50s for an unknown reason - with nos. 60-95 (maybe) if they both will have 35 J-15s each.
 

Intrepid

Major
... but my feeling tells me that there are indeed two squadrons - maybe even brigades with about 35 aircraft in formation. 1st one with J-15s nos. 01 to 35 and the 2nd one - skipping thee number 40s and 50s for an unknown reason - with nos. 60-95 (maybe) if they both will have 35 J-15s each.
If your feeling is correct, I'll guess 36 planes per squadron: 1 - 36 and 61 - 96. Or have we already seen # 60?
 

defenceman

Junior Member
Registered Member
Hi is it possible that PLAN is trying to manage the j15 before the third ACC fully operational and to get pilots more ready to be flown out once the 3 ACC comes online
if someone can possibly give Some more credible answer to this
thank you
 
Top