J-XY/J-35 carrier-borne fighter thread

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
Has this been posted before?

A parked J-35/31 with its weapons bay door open.

View attachment 112464

From the way the canopy opens, we can say that it isn't a J-31.

I.e.: it is the J-35/XY, the carrier based variant.

The J-31 itself is technically not a designation that exists yet, because the two land based testbeds that were flown prior to it, were FC-31, not J-31.
 

Schwerter_

Junior Member
Registered Member
A new albeit very blurry image … but is it a J-35 (if yes, then the pitot is gone) or just FC-31 no. 310003?

View attachment 112697
Seeing as this particular plane has separated flaps and ailerons (I think, the image is pretty blurry) which is a feature seen exclusively on the J-35, I’d say that this is indeed a J-35 prototype. The pitot tube thing is anyone’s guess though, it’d be easy enough for someone to photoshop it off before posting
 

ACuriousPLAFan

Colonel
Registered Member
Shenyang Aircraft Corp to start the construction of a new manufacturing/assembly hall. Length ~750 meters x Width ~290 meters x Height ~16 meters. Total build-up area is ~280 thousand m2.

Slated to start construction on the 19th this month, expected completion by the late-June 2025. Serial production inside the hall can be expected to begin sometime in 2026 or 2027.

Posted by @伏尔戈星图 on Weibo.

0074AOvDgy1het5xt1q9wj30u01uo7f2.jpg
0074AOvDgy1het5xtpy23j30u01ljwuq.jpg

It is said that this new Shenyang hall is comparable in size to the USAF Plant 4 building (responsible for manufacturing F-35s) in Forth Worth, Texas.
0074AOvDgy1het5bjs3mwj30va1vo7hk.jpg

According to him, the mass production of the J-35/31 can be expected in the future once the new hall enters operation.

=====

Personal comment (in Italic):
Perhaps this could also be hinting towards PLAAF operating land-based variant of the J-35/31 in the future?


PS: Addition
Note that I cannot vouch for the veracity of this (merely based on viewing other people's comments and my own gut feeling), so please reserve your judgement until official confirmation is available.
 
Last edited by a moderator:

ACuriousPLAFan

Colonel
Registered Member
Last edited:

Kalec

Junior Member
Registered Member
Some corrections on this claim:

And an interesting assertion vis-a-vis J-35 vs J-20 production:
I think OP is talking about hall-to-hall floor space not the total floor space of all buildings.

1686414558108.png

In fact Chengdu may have even fewer floor space than the proposed integrated Shenyang Hall, but somehow the production rate has reached at least 50 or optimistically 100 depending on which rumor one is buying in.

But he is making a point that floor space is not everything as we have no idea how many of these halls are used to assemble or making other sub system.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
I think OP is talking about hall-to-hall floor space not the total floor space of all buildings.

View attachment 114283

In fact Chengdu may have even fewer floor space than the proposed integrated Shenyang Hall, but somehow the production rate has reached at least 50 or optimistically 100 depending on which rumor one is buying in.

But he is making a point that floor space is not everything as we have no idea how many of these halls are used to assemble or making other sub system.

I'd also add that SAC in general will also produce a lot more in future beyond only J-XY/35 and variants.

I suspect high performance UAVs and UCAVs will be a big part of both CAC and SAC's future.


CAC still has that new hall being constructed at the moment as well; and once both SAC and CAC have both of their new halls finished, that would be quite a bit of production floor area for new aircraft.
 
Last edited:
Top