Aircraft Carriers

Status
Not open for further replies.

sumdud

Senior Member
VIP Professional
If I had a relatively weak navy(mostly FACs), I'd take the LHA. I'll have 2 LCACs, 4 small FACs in the bay along with......Type 63As, Type 97, and Type 92As.

Planes: Harriers, Ka-28s, CH-47s,
More tomorrow, night.
 

bd popeye

The Last Jedi
VIP Professional
sumdud said:
If I had a relatively weak navy(mostly FACs), I'd take the LHA. I'll have 2 LCACs, 4 small FACs in the bay along with......Type 63As, Type 97, and Type 92As.

Planes: Harriers, Ka-28s, CH-47s,
More tomorrow, night.

thank you my San Francisco friend for responding to my query:)

A CH-47 won't do well on a CV. The blades don't fold and they are impossible to tow because they have 4 landing gear with no nose gear. Trust me that makes it hard to move. In 1975 on CVA-19 during operation Frequent Wind we pushed 2 RVNAF Chinooks over the side becaue of these factors. Harriers? Humm..a proven aircraft...Same with the Ka-28's.
 

Obi Wan Russell

Jedi Master
VIP Professional
The RAFs Chinooks will be getting folding Rotor blades for operation from HMS Ocean, currently when the choppers are to be struck down to her hangar the blades are removed which takes about fifteen to twenty minutes in ideal conditions. As for towing oen around the deck, Ocean's crew seem to manage, and they also have to move Royal Marines Lynx and Gazelle helos which don't even have wheels!

I've already posted a picture on this forum of what I'd do to modify an LHA (Ski jump, portside deck extension to improve internal volume and increase flightdeck space) and as for aircraft, I'd go with the Tailored Air Group (TAG) concept. Buy more aircraft overall than the ship can accomodate at once and embark only those needed for a specific mission (ie a strike/ASW configured airgroup and an alternative Amphibious oriented airgroup, both of which would include Harriers or F-35Bs as they become available) With the larger CVs the full range could be embarked all at once, so an air group would ideally consist of 30 F-35Bs, 2(I'd prefer four) E-2 Hawkeyes for AEW (Essential), 8-10 EH-101 Merlins for ASW defence, and still have room for a large amphibious component (Ospreys ideally) but also including a mix of other types such as anti tank helo gunships like the AH-1Z Cobra or the Lynx AH7/9 (anti tank missiles like the AGM-65 Maverick can leave very big holes in FACs), and medium sized troop carrying helos like the Sea King HC4 and the Merlin HC3 which can double up in the SAR role. A larce CV such as a Forrestal or a Kitty Hawk could accomodate qiute a large contingent of troops in this configuration (1000+) making it a true all round vessel able to meet any threat other than going head to head with a US CVN.
 

Indianfighter

Junior Member
India’s Quest for an Indigenous Aircraft Carrier

by Admiral Arun Prakash, Indian Navy

Arun Prakash is the Chief of the Indian Navy. Here he describes the history of India’s quest for an aircraft carrier force, the challenges that have been met over the last 60 years and the successful route to indigenous carrier construction.

It was indeed fortuitous for our Navy that at the moment of India’s independence, those charged with planning for the nation’s embryonic maritime force included many men of vision. In 1948, within six months of freedom, a ten-year naval expansion plan had been prepared, largely by Royal Navy officers serving on secondment, for consideration by the Government of India.

The plan was drawn up around the concept of two fleets: one for the Bay of Bengal and the second for the Arabian Sea, each to be built around a light fleet carrier, to be replaced subsequently by a fleet carrier. The grandiose scheme provided for four fleet carriers and 280 ship-borne strike and fighter aircraft within the next few years. This plan received approval in principle from the Governor-General Earl Mountbatten, as well as the Prime Minister of India, Jawaharlal Nehru, but unfortunately failed to materialise because of a variety of reasons.

Hostilities with Pakistan in Jammu and Kashmir in the winter of 1947 had focused India’s attention on the Himalayas rather than the oceans, and the young nation’s scarce resources were being diverted to the Army. Moreover, the outbreak of the Korean War in 1950 required all World War Two naval aviation surpluses of the Royal Navy to be marshalled once again for service, and there was not enough to spare for the Indian Navy. However, the main impediment that emerged was a change of heart in His Majesty’s Government.

The reason why the British were willing to help bolster India’s naval strength was the basic assumption that the Indian Navy would form part of a Commonwealth-based bulwark against any possible depredations by the Soviet ‘Bear’ in the maritime domain (perhaps looking for warm water ports?).

However, by now India had decided to adopt an equidistant, non-aligned stance between the two ‘cold-warriors’ and her steadfast refusal to be part of any military alliance considerably dampened Royal Navy enthusiasm and support.

Arrival of the First Carrier

The dire financial straits of the fledgling nation also posed many hindrances to the planning process for creating a navy, but the carrier project eventually survived, albeit in a drastically diluted form. In 1957, the unfinished hull of HMS Hercules, a Majestic class light fleet carrier was acquired by India and taken in hand for completion in Belfast. Four
years later she was commissioned into the Indian Navy as INS Vikrant. Sister ships served in the Canadian and Australian navies for some years.

The aircraft complement of Vikrant was essentially a Hobson’s choice, and consisted of the Armstrong-Whitworth (later Hawker-Siddley) Seahawk – a straight-wing, first generation ground-attack jet fighter – and the French-built Breguet Alize turboprop ASW machine. Both aircraft served us faithfully, but by the late 1970s they were long in the tooth and needed urgent replacement.

The Royal Navy’s dilemma arising from the Defence White Paper of 1966, which saw her naval aviation being virtually dismantled, was mirrored to an extent in India. The Royal Navy had been deprived of both fixed-wing carriers and aircraft; the Indian Navy had a small carrier but could not find a new aircraft that was compatible.

The one single factor that led to the resurrection of the fleet air arm of the Royal Navy was the ‘discovery’ of the ski-jump by a young engineer named Lt Cdr Taylor. It was only with the ski-jump installed on board that the small ‘through deck cruisers’ of the Invincible class could become viable STOVL platforms. We joyously followed suit, and the first Indian Navy Sea Harrier FRS Mk. 51 was vertically landed on the deck of Vikrant, off Goa by the author in December 1983.

In the hot and light wind conditions of the Indian Ocean, undertaking STO operations from the flat deck of Vikrant in a Sea Harrier (with one outrigger on the catapult track) always remained an ‘exciting’ event, especially by night.

There was much relief in the aircrew room, therefore, when she was fitted out with a 12º ski-jump by Mumbai Dockyard in 1985. The range and payload of the Sea Harrier received a much-needed boost too.

Search for a Second Carrier

With the Vikrant getting on in years, there was serious concern in the Indian Navy that having constructed our operational and tactical doctrines around carrier aviation, we might, one day, find ourselves without a fixed-wing platform at sea. Apart from the operational penalties, what our planners dreaded most was the inevitable loss of flying and other expertise, painstakingly built up over three decades of ship-borne aviation at sea. Carriers were obviously not going to be available off-the-shelf and a serious thought process was triggered off in Naval HQ regarding the design and construction of an indigenous ship to meet our long-term needs.

The immediate outlook, however, remained bleak until 1985 when we received an offer from the Royal Navy for the sale of the 28,000-ton HMS Hermes. Laid down in World War Two, this 25-year-old ship had served the Royal Navy as a fixed-wing, commando and eventually STOVL carrier. The offer was eagerly accepted and, after a refit in Devonport, the Falklands flagship (wrongly claimed to have been struck by an Argentinean Exocet) sailed for India as INS Viraat. She had a 12º ski-jump and was well adapted for STOVL flying operations. Some of us had already flown from her deck during the Sea Harrier conversion in Yeovilton.

Vikrant was finally de-commissioned in 1997, and the Indian Navy has since been operating with just the Viraat at sea, with her complement of Sea Harriers FRS Mk51, Sea King Mk42 ASW helicopters and the Indian-built version of the Allouette III, known as Chetak. Occasional visitors on board include the Kamov-28 (ASW) and the Kamov-31 (AEW) helicopters.

Indigenous Endeavours

The Indian Navy’s small Directorate of Naval Design was, in the 1970s, deeply engrossed in the exciting maiden venture of licensed production of Leander class frigates being undertaken by the Mazagon Dockyard Mumbai. From time to time, they did, however, toss about various aircraft carrier design options, and a concept for the conversion of a passenger ship hull to a ‘flat-top’ was briefly examined in 1979–80, but discarded since it received no encouragement from any quarter.

By 1987, the Indian Navy had persuaded the Government to approve the commissioning of a concept study by Direction des Construction Navale (DCN), France, of a sea control ship of about 25,000 tons, capable of operating aircraft in the 15-ton category. The DCN report, received in 1989, covered two options: one of a conventional (catapult equipped) ship and the other of a ski-jump carrier, to be constructed at the Ministry of Shipping-owned Cochin Shipyard Ltd. The report unfortunately came in at a time of financial stringency and had to be shelved reluctantly by the Indian Navy.

However, the DCN exercise was not entirely futile, because it gave a fillip and inspiration to our own designers, and concept designs, first for a simple 16,500-ton ‘Harrier-Carrier’, and then for a larger, more versatile 20,000-ton ship emerged from the Directorate. The factors and choices for size/configuration of the ship formed a rather complex matrix, and I will need to digress a little to dwell on them.

The Options Available

Apart from the dimensions of the hangar, the size of the propulsion plant and capacity of fuel tanks and magazines, the most important determinant of carrier design is the flight deck, whose size and configuration depend on the type of aircraft operations intended.
John F. Lehman (former US SECNAV) in his book Aircraft Carriers: the Real Choices, written in 1978, provides some very useful empirical data. Studies have shown that to operate all conventional high-performance aircraft, a deck length of 912ft is required, and this would correspond to a displacement of about 60,000 tons. If heavier aircraft like the F-14 were excluded, the deck length could be reduced to 813ft with the ship displacing about 35,000–40,000 tons. Lower down the scale, a 650–700ft deck would suffice for purely STOVL operations and the ship would displace about 20,000 tons.

In the 1980s and 1990s, the choices of aircraft available to India were severely circumscribed on account of political considerations. Carrier-borne aircraft of US origin, by far the most capable in the market, were then just not available to us. The Soviets, our main purveyors of military hardware at that time, had only one shipboard fighter – the three-engined VTOL fighter Yak-36 (Forger) – to offer, but experience showed that the Sea Harrier, already in our inventory, was superior in most aspects. And then there were two more options, both at different stages of development: the French Rafale-M shipboard fighter and the Indian-designed Light Combat Aircraft (LCA).

However, at the end of all our studies, one factor emerged clearly: aircraft catapults were manufactured only in the USA, and since this piece of machinery was unlikely to be available to India, we could discard ship designs which were based on conventional aircraft requiring a catapult launch. This eliminated all US-origin deck aircraft as well as the Rafale as viable options.

Since we had already decided that the Yak-36 did not have much merit, our ship designers were placed in limbo once again. This is when the ingenuity of the Russians came to our rescue.

Enter STOBAR

Towards the end of the 1980s, word started trickling out of the USSR of an unusual experiment being undertaken by the Morskaya Aviatsia, the air arm of the Red Navy. Having shed their dogmatic animus of many years to flat-tops, the Soviets were planning to make a dramatic entry into the arcane field of carrier aviation. They planned to shun the trodden path and do this through the medium of ski-jump equipped carriers.

But what about the flying machines?


Having realised the limitations of their VTOL endeavours, they chose three (conventional) shore-based combat aircraft and undertook extensive modifications to enable ramp take-offs and hook-assisted ‘arrests’ on board. The aircraft chosen were the Sukhoi-25 (trainer and strike aircraft), the Sukhoi-27 and the MiG-29. The modified versions of the aircraft were given the suffix “K” (for Korabelnyy, or ship) and this mode of operation added a new term to the lexicon of naval aviation: STOBAR which stood for ‘short take-off but arrested landing’.

The Air Defence Ship

With this development, our carrier design options began to acquire some clarity, and the Staff Requirements having been reviewed, the designers returned to the drawing board.

However, the continuing uncertainty about aircraft availability made their job difficult, and the first tentative design that emerged was for a 20,000-ton carrier named euphemistically the ‘air defence ship’ or ADS. The ADS would operate the Sea Harrier (already in our inventory) and hopefully the indigenous LCA, whose ship-borne version was being explored.

However, a detailed feasibility study of a STOBAR version of the LCA by its design bureau revealed that a safe ski-jump launch and arrested recovery, though feasible, would make extra demands on this radical little strike-fighter. Although equipped with a digital flight control system, the delta wing configuration of the LCA (Navy) would require higher take-off and landing speeds. Consequently, the deck length had to be increased by about 15m, and the redesigned ship now displaced 24,000 tons, with a corresponding increase in cost.

By now the Indian Navy was seriously examining the Russians’ offer of their 1980s’ vintage helicopter/VTOL carrier Admiral Gorshkov, and a choice had to be made of a suitable aircraft. The obvious options were the Su-33 (a derivative of the Su-27K selected for operation from the 67,500-ton carrier, Kuznetsov), and the Mig-29K. An evaluation revealed that both aircraft would meet our operational requirements. The Su-33, though more capable, being dimensionally larger would not only not fit in the smaller hangar of the 44,500-ton Gorshkov, but would have marginal wing-tip clearances from the island structure during deck launch. It was therefore decided that the Mig-29K would equip the Gorshkov, to be renamed INS Vikramaditya in Indian service.

The downstream impact of this decision was instantly felt by the ADS programme, and a fresh design exercise was initiated to assess the implications of MiG-29K STOBAR operations on the ADS design. According to the planners, the ship’s basic complement would be a squadron each of MiG-29s and assorted helicopters. The option of operating the upgraded Sea Harriers was also catered for, until the LCA (Navy) received its full operational clearance. The workshops, magazines, deck and lift configurations as well as crew spaces had to be reworked.

The staff requirements having been finalized in 1999, the ADS emerged, in its definitive form, as a 37,000-ton vessel, to be powered by four LM-2500 gas turbines in COGAG arrangement, which would give it a top speed of 28 knots. The 830ft long angled flight deck would have a set of three arrester wires aft rated to handle aircraft of up to 22-ton all-up weight. A set of jet blast deflectors and hydraulic chocks would be installed to provide a 600ft deck run for launch of the Mig-29K and LCA (Navy), from the 14º ski-jump launch using afterburner. The ship would carry an air group of 30 aircraft and helicopters and would be crewed by about 1400 personnel.

The Indigenous Aircraft Carrier


The project received financial approval of the Government of India in January 2003, and first steel was ceremonially cut in Cochin Shipyard Ltd on 11 April 2005, when the ADS was re-designated as the ‘IAC’ or indigenous aircraft carrier.

Consultancy for propulsion system integration will come from M/S Fincantieri of Italy (now in the final stages of completing the Italian carrier Count Cavour) and, for the aviation complex, from M/S Nevskoie Design Bureau of Russia.

Some early problems relating to shipbuilding steel and selection of equipment have been resolved and the yard is optimistic about meeting the delivery schedule of 2012–13. There are no illusions about the complexity of the undertaking and, on account of certain residual imponderables, the shipyard plans to execute the contract in two phases. It is expected that the uncertainties, especially those relating to equipment that needs to be imported will have been resolved by the time work starts on Phase II. The financial estimates for the IAC have therefore remained somewhat flexible so far.

As a practising adherent of ship-borne aviation for the past 45 years, the Indian Navy aims to fulfil its long-term operational commitments in the IOR by deploying two carrier task forces at sea, while a third ship is under maintenance or refit. This would be the embodiment of a concept mooted in our plans as far back as 1948.

The arrival of the Vikramaditya and her squadron of Mig-29K fighters in 2008 would certainly add considerable combat power to the Indian Navy, and the Service looks forward to the IAC joining the fleet in the next decade. However, while we take up a case for construction of a second IAC, we need to assess the residual life of the sturdy old Viraat.

Building an aircraft carrier for the first time is no doubt going to be a challenging task for India’s warship designers and builders. The commissioning of this ship in the next decade will not only be a defining event for our industry, but also a concrete manifestation of the determination and resolve with which we have pursued the vision of becoming a ‘builders’ navy’.

Source:
Please, Log in or Register to view URLs content!
 

bd popeye

The Last Jedi
VIP Professional
Indianfighter. Thanks for posting that history of IN CV development. :) Excellent article. I think that the true test of the IN will come when the first ADS is ready to put to sea. Because the IN has experience operating CV's they should have a smooth transition to their ADS ship.

Obi Wan sez;
The RAFs Chinooks will be getting folding Rotor blades for operation from HMS Ocean, currently when the choppers are to be struck down to her hangar the blades are removed which takes about fifteen to twenty minutes in ideal conditions. As for towing oen around the deck, Ocean's crew seem to manage, and they also have to move Royal Marines Lynx and Gazelle helos which don't even have wheels!

To me an experienced USN carrier sailor. Those Chinooks are a pain to tow because of the lack of nose wheel gear. But I'm sure the RN has devised some method to tow those beast. I know Hueys have tires attatched to the skids... Some pics of the USN 1975 method of moving Chinooks & Huey's is below in a thumbnail.

I like the idea of outfitting a ship for a specfic mission with the TAG concept. Of course your ship's crew, airwing and embarked marines would have to constantly train to be ready for any mission. Of course that's what sailors and marines do!

I have not decided on what sort of CVW I would outfit my ship with..I will later.
 

Attachments

  • ch47over21kk.jpg
    ch47over21kk.jpg
    15.5 KB · Views: 9
  • midway-821b.jpg
    midway-821b.jpg
    42.7 KB · Views: 17

Obi Wan Russell

Jedi Master
VIP Professional
With the TAG concept any squadrons not embarked for the current mission will be able to continue their training programs uninterrupted at home, and can be deployed to the carrier at short notice if a sudden role change is required. This has been the Standard Operating Procedure of the RN's carriers for some years now, mainly alternating between the CV role with an Air group of 7 Sea Harrier F/A-2s, 7Harrier GR7s, 4 Merlin HMA1s and 3 Sea King ASAC7s, and the LPH role with a mixed air group of Chinooks, Sea King HC4s and ASAC7s, and Lynx AH7s. If your carrier is large enough (eg the hypothetical reconditioned Forrestal or Kitty Hawk class mentioned above) you can embark both air groups at once and be on almost permanent standby for any emergency (when the ship is not in dock that is). During the second gulf war the USS Kitty Hawk left her fixed wing aircraft in Japan and deployed as the worlds largest LPH with marines and their supporting Helos, proving the concept of the TAG even though it has never been officially adopted by the USN.
 

bd popeye

The Last Jedi
VIP Professional
In my CV buying scenerio I've decided after inspecting both CV-59 and CV-64 that I will buy CV-59 simply because it is in better condition than CV-64. In it's history CV-64 suffered from reduction gear problems and on it's last few deployments it operated with only three screws. Now, even though the power plant on both CV's have been updated I will chose CV-59. It has fewer miles on her because she operatedin the Medterrian and Atlantic. Whereas CV-64 operated in the Pacific & Indian oceans.

The country I am purchasing this ship for is Japan!:D Yea I know Japan can't have a CV..but in my scenerio the Japanese Diet(legistrature) has ammended their consitution to allow for more "defensive" weapons. And a CV is one of them.

My air wing will be fixed wing and will consist of the following;

36 F/A-18 E/F Super Hornets Attack
12 F-35C Lightning JSF Fighter/Attack
6 MH-60S Seahawks ASW/SAR
2 E-2C Hawkeyes AEW
4 V-22A Osprey Heavy lift and logistics

The helos and Osprey would operate primarly from the bow leaving the angle deck for my fixed wing assets.

I would really like to have 4 E-2C's but being that I am Japan I have more E-2 assets ashore that I can use to provide AEW for my carrier borne aircraft. In addition I have 767 AWACS. I will not be operating my CV far from Japanese waters. It is for self defense you know.:D the majority of the training will be provided by the USN.
 

IDonT

Senior Member
VIP Professional
When the F-35 gets into service, US carriers will carry both the C and B versions. The USMC will replace both the Hornet and Harriers with just the B version for cost reasons. At least one Marine Squadron is embarked with the carriers airwi
 

Jeff Head

General
Registered Member
bd popeye said:
In my CV buying scenerio I've decided after inspecting both CV-59 and CV-64 that I will buy CV-59 simply because it is in better condition than CV-64.
Great choice, the Forrestal was 1st of class and a very good carrier. With the tender loving care they can give her there in Japan yards, she could have a lot of years of service left in her. Too bad they sunk the America, she would have been a great choice too.

bd popeye said:
The country I am purchasing this ship for is Japan!:D Yea I know Japan can't have a CV..but in my scenerio the Japanese Diet(legistrature) has ammended their consitution to allow for more "defensive" weapons..
Hmmm...a full size, full deck, super-carrier may be a hard sale as a purely defensive vessel. But, with the jitters and nerves going over there as they are, stranger things have happened.

bd popeye said:
My air wing will be fixed wing and will consist of the following.
You may want to add 4 EA-18G Growlers for EW.

2064634.EF182.jpg


29289036.EF18FSuperHornet3.jpg
 
Status
Not open for further replies.
Top