Two things,
NVR Naval Vessel Rules | eHow.com
and,
Naval Vessel Register - U.S. Navy
Of course we are looking at the first answer.
This is a discussion on Aircraft Carriers II within the World Armed Forces forums, part of the World Strategic Defence Area category; What does NVR stand for ?...
What does NVR stand for ?
Two things,
NVR Naval Vessel Rules | eHow.com
and,
Naval Vessel Register - U.S. Navy
Of course we are looking at the first answer.
Be sure to check out...
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
don't forget
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
am what I am.... 'Dat's all what I am"
Russia’s Baltic Shipyard United Shipbuilding Corporation (OCK) Starts Metal Cutting for Mistral
RussiaRussia’s Baltic Shipyard has started metal cutting for the hull of the first Mistral class amphibious assault ship being built in France for the Russian Navy, the United Shipbuilding Corporation said on Wednesday.
Russia and France signed a $1.2-billion contract on two French-built Mistral class ships, including the transfer of sensitive technology, in June 2011.
Under the contract, STX France will carry out the final assembly of the hulls from 24 blocks produced in Russia.
Two links showing RAN Camberra being loaded on the Blue Marlin tug before its trip to Down Under
RevistaNaval.com - Fotonoticia - El LHD «Canberra» y el «Blue Marlin» ya están en el puerto exterior de A Coruña
RevistaNaval.com - Fotonoticia - Operación de embarque del LHD «Canberra»
While INS Vikrant will be delivered late, India starts design work on much larger, 65,000 tons, carrier
While INS Vikrant will be delivered late, India starts design work on much larger, 65,000 tons, carrierIndian Navy Chief Admiral Nirmal Verma announced the nation's first indigenous aircraft carrier (IAC) INS Vikrant will not be ready until 2017, three years later than the planned schedule. However The New Indian Express daily reports that design work on the much larger aircraft carrier INS Vishal has already started.
“There were problems in manufacturing the gear box, which involves complex technology. The truck bringing generators overturned near Pune last year, further delaying the schedule,” Indian Navy Chief Admiral Nirmal Verma explained.
India plans a 65,000-tonne warship - The New Indian Express
More pics of the MiG-29K landing on the Vikramaditya.
image_502266cb06c1c.jpg
image_50226744b35b9.jpg
Special version of Ka-52K Helicopter with advanced radar and antiship missiles for Russian Mistrals
Special version of Ka-52 Helicopter with advanced radar and antiship missiles for Russian MistralsRussian Navy Mistral-class landing ships could see their power projection capabilities greatly improved thanks to a special version of the Kamov Ka-52 Alligator attack helicopter. The Russian Navy is designing a special version called "Ka-52K" to equip the four Mistral-class amphibious assault ships ordered from France.
IAC 2 is named vishaal
it is been reported in Warship magazine that Indias first home built carrier is now deplayed till 2017, my bet is it wont be ready till 2020
the reason is because some trucks carrying the parts over-turned and now need re-ordering!
yes Russian helicopter orders are pouring in since the Mistrals have been ordered, Russia is planning more than 100 helos for these LHDs alone
This is the Soviet aircraft carrier Baku later Admiral Gorshkov and now Vikramaditya.
Aircraft Carrier Baku.jpg
[video=youtu
Last edited by aksha; 08-10-2012 at 10:12 AM.
Last edited by aksha; 08-10-2012 at 10:59 AM.
Bookmarks